Location – Shropshire

Time to Complete – 6 Months

Year Complete – 2017

This stunning project was built and designed in partnership with Base Architects for a private client. Completed in 2017, Lakeside Lodge was constructed using local products, a request of the client, with a timber frame structure.

To read the full article, please visit our Shingler Construction website via the below link:

181106 base Lakeside Lodge

.

Share: